Inspection checklist

Asbestos demolition survey inspection checklist (England)

A pre-demolition checklist for England to confirm that asbestos has been identified, removed or controlled, and that a risk assessment is in place before any demolition or strip-out work begins.

Fill it in online - free, no account needed. 28 questions.

What it is for

This template helps ensure that asbestos risks are properly managed before demolition or strip-out work commences.

The full question list

1. Demolition Survey Documentation

  1. A demolition asbestos survey has been completed for the entire structure. *
  2. The demolition survey report is available on site. *
  3. The survey report clearly identifies the location and type of all asbestos-containing materials (ACMs). *
  4. The survey report includes a material assessment and a risk assessment for each identified ACM. *
  5. Name of the competent person who conducted the asbestos survey: *
  6. Date the asbestos survey was completed: *

2. Asbestos Removal and Control

  1. All identified ACMs requiring removal before demolition have been removed. *
  2. Evidence of licensed asbestos removal contractor engagement is available (if applicable). *
  3. Clearance certificates are available for all areas where ACMs have been removed. *
  4. Any remaining ACMs that do not require removal before demolition are clearly identified and protected. *
  5. Control measures for any remaining ACMs are documented and understood by all relevant personnel. *

3. Risk Assessment and Plan of Work

  1. A written risk assessment for asbestos exposure during demolition is available. *
  2. The risk assessment considers the findings of the demolition asbestos survey. *
  3. A plan of work detailing how the demolition will be carried out safely, considering asbestos, is available. *
  4. The plan of work includes emergency procedures for unexpected asbestos finds or incidents. *
  5. The plan of work specifies personal protective equipment (PPE) requirements for asbestos-related tasks. *

4. Worker Awareness and Training

  1. All workers involved in demolition or strip-out have received asbestos awareness training. *
  2. Workers undertaking asbestos removal or handling tasks have received specific task-related training. *
  3. Workers are aware of the locations of any remaining ACMs on site. *
  4. Workers know the procedures to follow if they discover suspected asbestos during work. *

5. Site Readiness and Permitting

  1. The demolition area is secured to prevent unauthorised access. *
  2. All necessary permits and notifications for demolition work have been obtained and are displayed. *
  3. Emergency contact information is clearly displayed on site. *

6. Pre-Demolition Sign-off

  1. All checks in this template have been completed and passed. *
  2. No demolition or strip-out work will commence until all identified issues are resolved. *

7. Completion Details

  1. Completed by (Name): *
  2. Date and Time of Completion: *
  3. Signature: *

References

How the score works

The score is the share of scored questions that pass. N/A is left out of the score; text, dates and signatures are recorded but not scored. A completed template is a record of what you checked; it is not an inspection by a regulator or an accreditation body.

Questions

Why is an asbestos demolition survey important?

An asbestos demolition survey is crucial to identify all asbestos-containing materials (ACMs) in a building before demolition, preventing uncontrolled exposure to asbestos fibres which can cause serious health issues.

Who is responsible for ensuring asbestos compliance before demolition?

The client, principal designer, principal contractor, and any contractors involved in the demolition work all have duties under the Construction (Design and Management) Regulations 2015 and the Control of Asbestos Regulations 2012 to ensure asbestos is safely managed.