Inspection checklist
Asbestos demolition survey inspection checklist (England)
A pre-demolition checklist for England to confirm that asbestos has been identified, removed or controlled, and that a risk assessment is in place before any demolition or strip-out work begins.
Fill it in online - free, no account needed. 28 questions.
What it is for
This template helps ensure that asbestos risks are properly managed before demolition or strip-out work commences.
- Confirming a demolition asbestos survey is held and complete
- Verifying all identified asbestos-containing materials (ACMs) are removed or controlled
- Checking that a written asbestos risk assessment and plan of work are in place
- Ensuring workers are aware of asbestos risks and procedures
- Documenting the pre-demolition asbestos compliance check
The full question list
1. Demolition Survey Documentation
- A demolition asbestos survey has been completed for the entire structure. *
- The demolition survey report is available on site. *
- The survey report clearly identifies the location and type of all asbestos-containing materials (ACMs). *
- The survey report includes a material assessment and a risk assessment for each identified ACM. *
- Name of the competent person who conducted the asbestos survey: *
- Date the asbestos survey was completed: *
2. Asbestos Removal and Control
- All identified ACMs requiring removal before demolition have been removed. *
- Evidence of licensed asbestos removal contractor engagement is available (if applicable). *
- Clearance certificates are available for all areas where ACMs have been removed. *
- Any remaining ACMs that do not require removal before demolition are clearly identified and protected. *
- Control measures for any remaining ACMs are documented and understood by all relevant personnel. *
3. Risk Assessment and Plan of Work
- A written risk assessment for asbestos exposure during demolition is available. *
- The risk assessment considers the findings of the demolition asbestos survey. *
- A plan of work detailing how the demolition will be carried out safely, considering asbestos, is available. *
- The plan of work includes emergency procedures for unexpected asbestos finds or incidents. *
- The plan of work specifies personal protective equipment (PPE) requirements for asbestos-related tasks. *
4. Worker Awareness and Training
- All workers involved in demolition or strip-out have received asbestos awareness training. *
- Workers undertaking asbestos removal or handling tasks have received specific task-related training. *
- Workers are aware of the locations of any remaining ACMs on site. *
- Workers know the procedures to follow if they discover suspected asbestos during work. *
5. Site Readiness and Permitting
- The demolition area is secured to prevent unauthorised access. *
- All necessary permits and notifications for demolition work have been obtained and are displayed. *
- Emergency contact information is clearly displayed on site. *
6. Pre-Demolition Sign-off
- All checks in this template have been completed and passed. *
- No demolition or strip-out work will commence until all identified issues are resolved. *
7. Completion Details
- Completed by (Name): *
- Date and Time of Completion: *
- Signature: *
References
- Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 15(2)
A contractor must plan, manage and monitor construction work carried out either by the contractor or by workers under the contractor's control, to ensure that, so far as is reasonably practicable, it is carried out without risks to health and safety.
Read the source - Supports evidence for: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 5
An employer must not undertake work in demolition, maintenance or any other work which exposes or is liable to expose employees of that employer to asbestos in respect of any premises unless either— (a) that employer has carried out a suitable and sufficient assessment as to whether asbestos
Read the source - Supports evidence for: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 6(1)
An employer must not carry out work which is liable to expose employees of that employer to asbestos unless that employer has— (a) made a suitable and sufficient assessment of the risk created by that exposure to the health of those employees and of the steps that need to be taken to meet the requirements of these Regulations; (b) recorded the significant findings of that risk assessment as soon as is practicable after the risk assessment is made; and (c) implemented the steps referred to in sub-paragraph (a).
Read the source - Required by: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 5
An employer must not undertake work in demolition, maintenance or any other work which exposes or is liable to expose employees of that employer to asbestos in respect of any premises unless either— (a) that employer has carried out a suitable and sufficient assessment as to whether asbestos
Read the source - Required by: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 6(1)
An employer must not carry out work which is liable to expose employees of that employer to asbestos unless that employer has— (a) made a suitable and sufficient assessment of the risk created by that exposure to the health of those employees and of the steps that need to be taken to meet the requirements of these Regulations; (b) recorded the significant findings of that risk assessment as soon as is practicable after the risk assessment is made; and (c) implemented the steps referred to in sub-paragraph (a).
Read the source - Required by: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 6(1)
An employer must not carry out work which is liable to expose employees of that employer to asbestos unless that employer has— (a) made a suitable and sufficient assessment of the risk created by that exposure to the health of those employees and of the steps that need to be taken to meet the requirements of these Regulations; (b) recorded the significant findings of that risk assessment as soon as is practicable after the risk assessment is made; and (c) implemented the steps referred to in sub-paragraph (a).
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 15(2)
A contractor must plan, manage and monitor construction work carried out either by the contractor or by workers under the contractor's control, to ensure that, so far as is reasonably practicable, it is carried out without risks to health and safety.
Read the source - Required by: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 5
An employer must not undertake work in demolition, maintenance or any other work which exposes or is liable to expose employees of that employer to asbestos in respect of any premises unless either— (a) that employer has carried out a suitable and sufficient assessment as to whether asbestos
Read the source - Required by: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 6(1)
An employer must not carry out work which is liable to expose employees of that employer to asbestos unless that employer has— (a) made a suitable and sufficient assessment of the risk created by that exposure to the health of those employees and of the steps that need to be taken to meet the requirements of these Regulations; (b) recorded the significant findings of that risk assessment as soon as is practicable after the risk assessment is made; and (c) implemented the steps referred to in sub-paragraph (a).
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 15(2)
A contractor must plan, manage and monitor construction work carried out either by the contractor or by workers under the contractor's control, to ensure that, so far as is reasonably practicable, it is carried out without risks to health and safety.
Read the source - Required by: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 6(1)
An employer must not carry out work which is liable to expose employees of that employer to asbestos unless that employer has— (a) made a suitable and sufficient assessment of the risk created by that exposure to the health of those employees and of the steps that need to be taken to meet the requirements of these Regulations; (b) recorded the significant findings of that risk assessment as soon as is practicable after the risk assessment is made; and (c) implemented the steps referred to in sub-paragraph (a).
Read the source - Supports evidence for: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 6(1)
An employer must not carry out work which is liable to expose employees of that employer to asbestos unless that employer has— (a) made a suitable and sufficient assessment of the risk created by that exposure to the health of those employees and of the steps that need to be taken to meet the requirements of these Regulations; (b) recorded the significant findings of that risk assessment as soon as is practicable after the risk assessment is made; and (c) implemented the steps referred to in sub-paragraph (a).
Read the source - Required by: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 8(1)
An employer must hold a licence granted under paragraph (2) before undertaking any licensable work with asbestos.
Read the source - Required by: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 10(1)
Every employer must ensure that any employee employed by that employer is given adequate information, instruction and training where that employee— (a) is or is liable to be exposed to asbestos
Read the source - Required by: The Control of Asbestos Regulations 2012 (SI 2012/632), reg. 10(1)
Every employer must ensure that any employee employed by that employer is given adequate information, instruction and training where that employee— (a) is or is liable to be exposed to asbestos
Read the source - Required by: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 15(2)
A contractor must plan, manage and monitor construction work carried out either by the contractor or by workers under the contractor's control, to ensure that, so far as is reasonably practicable, it is carried out without risks to health and safety.
Read the source
How the score works
The score is the share of scored questions that pass. N/A is left out of the score; text, dates and signatures are recorded but not scored. A completed template is a record of what you checked; it is not an inspection by a regulator or an accreditation body.
Questions
Why is an asbestos demolition survey important?
An asbestos demolition survey is crucial to identify all asbestos-containing materials (ACMs) in a building before demolition, preventing uncontrolled exposure to asbestos fibres which can cause serious health issues.
Who is responsible for ensuring asbestos compliance before demolition?
The client, principal designer, principal contractor, and any contractors involved in the demolition work all have duties under the Construction (Design and Management) Regulations 2015 and the Control of Asbestos Regulations 2012 to ensure asbestos is safely managed.