Log
CDM 2015 compliance log for construction sites (Great Britain)
This template helps log compliance with the Construction (Design and Management) Regulations 2015 (CDM 2015) on construction sites in Great Britain, covering planning, site safety, worker competence, and welfare.
Fill it in online - free, no account needed. 31 questions.
What it is for
This template provides a structured log for checking compliance with the Construction (Design and Management) Regulations 2015 (CDM 2015) on construction sites.
- Recording observations during site safety inspections
- Verifying the presence and adequacy of the construction phase plan
- Assessing worker competence and site induction effectiveness
- Checking the safety of excavations and site access controls
- Documenting emergency arrangements and welfare provisions
- Identifying areas requiring corrective actions to meet CDM 2015
The full question list
1. Site Information and Planning
- Date and time of inspection *
- Site name and location *
- Principal Contractor name *
- A construction phase plan is available on site. *
- The construction phase plan is specific to this site and work. *
- The site induction process is clearly documented and available. *
- Measures are in place to prevent unauthorised access to the site. *
2. Work Management and Supervision
- Each contractor's work activities are visibly planned and managed. *
- Supervisors are present and actively monitoring work activities. *
- Number of workers observed wearing appropriate PPE for their tasks. *
- Workers appear to have the necessary skills and knowledge for their tasks. *
- Evidence of worker training records is available on request.
3. Site Safety and Environment
- Walkways and access routes are clear, unobstructed, and well-lit. *
- Site housekeeping is maintained, with waste managed appropriately. *
- Scaffolding and temporary works are visibly safe and inspected. *
- Excavations are supported or battered to prevent collapse. *
- Measures are in place to prevent material falling into excavations. *
- Emergency arrangements, including evacuation procedures, are clearly displayed. *
- Fire fighting equipment is available and accessible. *
- First aid facilities and trained personnel are available. *
4. Equipment and Plant
- Plant and equipment are visibly in good working order. *
- Operators of plant and equipment appear competent. *
- Safety guards are in place on machinery where required. *
- Electrical equipment and cables are in good condition and safely routed. *
5. Worker Engagement and Welfare
- Welfare facilities (toilets, washing, changing) are clean and adequate. *
- Drinking water is readily available to all workers. *
- Workers are observed engaging in safe working practices. *
- Any immediate hazards observed (describe actions taken)
6. Sign-off
- Completed by (Name) *
- Date of completion *
- Signature *
References
- Required by: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 12(1)
During the pre-construction phase, and before setting up a construction site, the principal contractor must draw up a construction phase plan, or make arrangements for a construction phase plan to be drawn up.
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 12(1)
During the pre-construction phase, and before setting up a construction site, the principal contractor must draw up a construction phase plan, or make arrangements for a construction phase plan to be drawn up.
Read the source - Required by: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 13(4)
The principal contractor must ensure that— (a) a suitable site induction is provided; (b) the necessary steps are taken to prevent access by unauthorised persons to the construction site
Read the source - Required by: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 13(4)
The principal contractor must ensure that— (a) a suitable site induction is provided; (b) the necessary steps are taken to prevent access by unauthorised persons to the construction site
Read the source - Required by: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 15(2)
A contractor must plan, manage and monitor construction work carried out either by the contractor or by workers under the contractor's control, to ensure that, so far as is reasonably practicable, it is carried out without risks to health and safety.
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 15(2)
A contractor must plan, manage and monitor construction work carried out either by the contractor or by workers under the contractor's control, to ensure that, so far as is reasonably practicable, it is carried out without risks to health and safety.
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 15(2)
A contractor must plan, manage and monitor construction work carried out either by the contractor or by workers under the contractor's control, to ensure that, so far as is reasonably practicable, it is carried out without risks to health and safety.
Read the source - Required by: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 15(7)
A contractor must not employ or appoint a person to work on a construction site unless that person has, or is in the process of obtaining, the necessary skills, knowledge, training and experience to carry out the tasks allocated to that person
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 15(7)
A contractor must not employ or appoint a person to work on a construction site unless that person has, or is in the process of obtaining, the necessary skills, knowledge, training and experience to carry out the tasks allocated to that person
Read the source - Required by: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 22(1)
All practicable steps must be taken to prevent danger to any person, including, where necessary, the provision of supports or battering, to ensure that— (a) no excavation or part of an excavation collapses
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 22(1)
All practicable steps must be taken to prevent danger to any person, including, where necessary, the provision of supports or battering, to ensure that— (a) no excavation or part of an excavation collapses
Read the source - Required by: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 30(1)
suitable and sufficient arrangements for dealing with any foreseeable emergency must be made and, where necessary, implemented, and those arrangements must include procedures for any necessary evacuation of the site or any part of it.
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 30(1)
suitable and sufficient arrangements for dealing with any foreseeable emergency must be made and, where necessary, implemented, and those arrangements must include procedures for any necessary evacuation of the site or any part of it.
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 30(1)
suitable and sufficient arrangements for dealing with any foreseeable emergency must be made and, where necessary, implemented, and those arrangements must include procedures for any necessary evacuation of the site or any part of it.
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 15(7)
A contractor must not employ or appoint a person to work on a construction site unless that person has, or is in the process of obtaining, the necessary skills, knowledge, training and experience to carry out the tasks allocated to that person
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 15(2)
A contractor must plan, manage and monitor construction work carried out either by the contractor or by workers under the contractor's control, to ensure that, so far as is reasonably practicable, it is carried out without risks to health and safety.
Read the source
How the score works
The score is the share of scored questions that pass. N/A is left out of the score; text, dates and signatures are recorded but not scored. A completed template is a record of what you checked; it is not an inspection by a regulator or an accreditation body.
Questions
What are the CDM 2015 Regulations?
The Construction (Design and Management) Regulations 2015 (CDM 2015) are the main regulations for managing health, safety and welfare on construction projects in Great Britain. They apply to all construction work and place duties on clients, designers, and contractors.
Who should use this log?
This log is designed for anyone responsible for health and safety on a construction site in Great Britain, including principal contractors, site managers, and health and safety advisors, to systematically check and record compliance with CDM 2015.