Inspection checklist
Demolition exclusion zone inspection checklist (England)
This checklist helps verify that demolition exclusion zones in England are correctly sized, secured, signed, and managed to protect workers and the public.
Fill it in online - free, no account needed. 34 questions.
What it is for
This template provides a structured way to inspect demolition exclusion zones on construction sites in England.
- Verify exclusion zone sizing for demolition methods and structures
- Check physical barriers and signage effectiveness
- Confirm access control and public safety measures
- Assess worker knowledge of exclusion zone procedures
- Review relevant documentation and records
The full question list
1. Physical Barriers and Signage
- The exclusion zone is fully enclosed by physical barriers (e.g., hoarding, fencing) that are at least 2 meters high. *
- Barriers are stable. *
- Barriers show no signs of damage or compromise. *
- Number of entry/exit points into the exclusion zone. *
- All entry/exit points are secured. *
- All entry/exit points are controlled. *
- Warning signs (e.g., 'Danger Demolition in Progress', 'No Unauthorised Entry') are clearly visible at all access points. *
- Warning signs (e.g., 'Danger Demolition in Progress', 'No Unauthorised Entry') are clearly visible along the perimeter. *
- Signs are legible. *
- Signs are in good condition. *
2. Access Control and Public Safety
- Dedicated personnel are present to monitor access to the exclusion zone during live operations. *
- Dedicated personnel are present to control access to the exclusion zone during live operations. *
- No unauthorised personnel (public, other contractors not involved in demolition) are observed inside the exclusion zone. *
- Pedestrian routes outside the exclusion zone are clearly diverted. *
- Pedestrian routes outside the exclusion zone are safe. *
- Vehicle routes outside the exclusion zone are clearly diverted. *
- Vehicle routes outside the exclusion zone are safe. *
- Emergency access routes are maintained. *
- Emergency access routes are unobstructed. *
3. Worker Knowledge and Procedures
- Workers observed in the exclusion zone are wearing appropriate Personal Protective Equipment (PPE). *
- A worker asked can identify at least one specific hazard associated with the current demolition phase. *
- A worker asked can describe at least one emergency procedure for the site. *
- A worker asked can identify the boundaries of the exclusion zone. *
- A worker asked can identify at least one restriction of the exclusion zone. *
4. Documentation and Records
- The Demolition Plan available on site includes details of exclusion zones for all phases. *
- Risk assessments available on site for demolition activities consider the exclusion zone requirements. *
- Site induction records available on site confirm that all workers have been briefed on exclusion zone procedures. *
5. Follow-up Actions
- Any identified deficiencies have been immediately addressed. *
- Any identified deficiencies have been reported for action. *
- Details of any immediate corrective actions taken.
- Details of any further actions required and responsible person.
6. Sign-off
- Name of person completing this inspection *
- Date and time of sign-off *
- Signature *
References
- Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 13(4)
The principal contractor must ensure that— (a) a suitable site induction is provided; (b) the necessary steps are taken to prevent access by unauthorised persons to the construction site
Read the source - Required by: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 27(1)
A construction site must be organised in such a way that, so far as is reasonably practicable, pedestrians and vehicles can move without risks to health or safety.
Read the source - Required by: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 27(1)
A construction site must be organised in such a way that, so far as is reasonably practicable, pedestrians and vehicles can move without risks to health or safety.
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 13(4)
The principal contractor must ensure that— (a) a suitable site induction is provided; (b) the necessary steps are taken to prevent access by unauthorised persons to the construction site
Read the source - Supports evidence for: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 13(4)
The principal contractor must ensure that— (a) a suitable site induction is provided; (b) the necessary steps are taken to prevent access by unauthorised persons to the construction site
Read the source - Required by: The Construction (Design and Management) Regulations 2015 (SI 2015/51), reg. 13(4)
The principal contractor must ensure that— (a) a suitable site induction is provided; (b) the necessary steps are taken to prevent access by unauthorised persons to the construction site
Read the source
How the score works
The score is the share of scored questions that pass. N/A is left out of the score; text, dates and signatures are recorded but not scored. A completed template is a record of what you checked; it is not an inspection by a regulator or an accreditation body.
Questions
Why is an exclusion zone inspection important?
Regular inspections ensure that demolition exclusion zones remain effective in preventing unauthorised access and protecting individuals from demolition hazards, which is a legal requirement.
How often should this checklist be used?
This checklist should be used before and during each phase of demolition, especially when methods or structures change, to ensure continuous safety and compliance.